Installation of doors with invisible frame

Have you decided to install secret door? We've prepared information to help you understand the ordering and installation steps. So you can properly plan your renovation.

Catalog

Invisible doors

What's important to know when ordering secret doors?

  1. The most important thing is that the invisible frame is installed at the stage of construction works! That is, door installation is carried out in two stages: first, the aluminum frame is mounted on the walls without finishing, and after finishing the walls, the door leaf is installed.
  2. Installation of the Barausse Secret hidden door. Installation steps and features

  3. The dimensions of the door openings must correspond to the standard dimensions of the doors, so you do not have to pay too much for non-standard dimensions. Standard doorway dimensions: width 710, 810, 910 mm, height 2160 mm. The maximum height of the opening is 3060 mm.
  4. It is necessary to decide on the materials in advance: flooring and wall finishes, as this information is taken into account by the master when installing the frame.
  5. The frame is adjusted to the height of the finished floor, so the door installer needs to know the thickness of the floor covering. For the door leaf to be flush with the wall, the door installer must set the frame with an offset equal to the thickness of the wall finish.

    It is also important decide on the opening side (right/left) and the opening method (from/to yourself) at the beginning. This information is required for ordering at the factory and cannot be changed during installation.

    The hinge holes in the secret frame are made at the factory on the right or left side, i.e. the frame is not reversible, you cannot select the opening side during installation, you must do this in advance. Take into account that the door leaf will be flush with the wall only on one side. A normal door leaf opens towards itself on this side. If you want the leaf to be flush with the wall and open away from you, we order an Inverso leaf from the factory, which is 1.5 cm thicker than the normal leaf. In this case, the door will open on maximum of 90°.

    Installation diagram for flush-mounted door frame

    Standard door leaf


    Installation diagram for flush-mounted door frame with Inverso leaf

    Inverso door leaf


  6. You can order a primed door leaf with factory finish (natural veneer, acrylate, mirror, etc.) or primed doors , its finishing is performed at the object together with the finishing of the walls.
  7. SHINY ON SECRET high gloss finish (right), YOU SECRET finish (left)

    SHINY ON SECRET high gloss finish (right), YOU SECRET finish (left)


    Mirror panel VANITA SECRET

    Mirror panel VANITA SECRET


    Finish with Baklite (cement effect) ARDESIA IN SECRET

    Finish with Baklite (cement effect) ARDESIA IN SECRET


  8. The aluminum frame comes painted white with the option of on-site painting.
  9. You can order extra:
    • a leaf with a retractable threshold that protects the room from noise and odors;
    • a push handle in the same finish as the leaf;
    • magnetic lock, thanks to which the door opens and closes silently;
    • integrated door closers for easy closing;
    • o skirting board flush with the wall (secret skirting board).

Additional options for secret doorsAdditional options for secret doors

Catalog

Stages of ordering and installation of invisible doors

  1. During the construction phase, our door installer will come to you, take measurements and make recommendations on finishes if necessary.
  2. We coordinate with you the dimensions, door configuration, side and method of opening, leaf finish and make the order at the factory.
  3. Mount the aluminum frame, taking into account the height of the finished floor and the thickness of the planned wall finish.
  4. Now it is possible to finish the walls (plastering, painting or wallpapering, laying tiles, installing wall panels) and install flooring.
  5. Install the door leaf. If the door leaf is to be finished, it should be installed at the stage of finishing the walls.

Any questions? Call us or visit our showroom – we'll tell you and explain based on the examples we've installed.

+370 613 899-55

Related Articles